I 1400x520MG_1072
> <

GE Pig Receiver

Civmec is undertaking the fabrication and testing of a new 34-inch Subsea Pig Launcher/Receiver (SSPLR) for the Chevron Gorgon LNG Project, on behalf of GE Oil and Gas in two stages.

Stage 1 works involve the fabrication of a 34-inch barrel for a Subsea Pig Receiver from supplied materials, with the complete structure weighing 104 tonnes. Stage 2 works include the fabrication of a 6-inch kicker header, testing of the SSPLR and retro-fitting.

Back to projects