Hope Downs 4 Expansion Project Eastern Stream

Civmec delivered major site construction civil works at Hope Downs 4 (HD4) mine for Rio Tinto in support of sustaining production tonnage in the Pilbara.

Rio Tinto constructed the Hope Downs 4 project to provide an annual production capacity of 15 million tonnes of iron ore from 2013. In support of this goal, major services provided by Civmec included all temporary and permanent works necessary to complete the concrete work for the following facilities:

  •                 Primary Crusher Building
  •                 Primary Crushed Ore Conveyor
  •                 Secondary Crusher Building
  •                 Screening Feed Conveyor
  •                 Screen Building
  •                 Screens Oversize Conveyor
  •                 Lump Product Conveyor
  •                 Fines Product Conveyor
  •                 Transfer Station
  •                 Wet Screening Building
  •                 Transfer Station – Surge Bin
  •                 Scrubber Feed Conveyors
  •                 Trommel Oversize Conveyor
  •                 Trommel Oversize Transfer Conveyor
  •                 Classification and Separation Building
  •                 Tailings Thickening
  •                 Tailings Transportation
  •                 Tailings Stockpiling/Storage
  •                 Lump Product Sampling
  •                 Lump Stacker
  •                 Lump Stockpile Conveyor
  •                 Fines Stacker
  •                 Lump Sampling Conveyor
  •                 Fines Stockpile Conveyor
  •                 Fines Product Sampling
  •                 Reclaimer
  •                 Reclaiming/Loadout Conveyor
  •                 Train Loadout Station
  •                 Site Development and In-Plant Roads
  •                 Water

Throughout the project Civmec maintained a team of up to 180 skilled personnel.