Woodman Point_Banner
> <

Woodman Point Wastewater Treatment Plant

Civmec in an EPC alliance model contract with Black & Veatch for the design and construction of the Woodman Point Wastewater Treatment Plant upgrade project which will see the plant’s capacity increase to upgrade to 180ml/day.

Civmec in an EPC alliance model contract with Black & Veatch for the design and construction of the Woodman Point Wastewater Treatment Plant upgrade project which will see the plant’s capacity increase to upgrade to 180ml/day.

• Earthworks – 250,000m3
• Formwork – 8,000m2
• Reinforcement – 2,000t
• Concrete – 13,000m3
• SMP Structural Steel – 2,000t
• Piping – 13,000lm
• Precast – 1,160 units
• Structural Steel Fabrication – 2,000t
• Pipe Fabrication – 4,500lm