The works included precision fabrication, application of thermal spray aluminium for corrosion protection, and pre-commissioning testing to meet stringent offshore project requirements.
Each spool measured approximately 120 metres in length, while the spreader bars measured around 100 metres by 20 metres and weighed approximately 200 tonnes each.
Spool kits were coated in Thermal Spray Aluminium (TSA), an advanced coating system that provides extreme corrosion resistance for long-term durability and asset integrity. Civmec’s execution of the TSA works on this project was recognised and commended by the client for its quality, effectiveness, and reliability throughout project delivery.
The J-IC Project, operated by Chevron Australia, will use proven subsea compression technology to enhance recoverability from the Jansz-Io gas field and sustain the supply of natural gas to LNG and domestic gas facilities on Barrow Island.
With close collaboration between all parties on the project, the modules, which connect directly to the Subsea Compression Manifold Station (SCMS), were completed to the project’s exacting standards and received positive feedback from both the client and asset owner.