Our scope of work included the fabrication, offsite trial assembly, delivery and site assembly of the 200 metre long bridge. We undertook the assembly of the final bridge structure in a purpose-built 65 metre onsite workshop, complete with two 20 tonne gantry cranes.The complexity of the onsite assembly also required the fabrication and installation of engineered temporary collapsible access platforms.
The bridge provides a safe crossing for pedestrians and cyclists over the Nepean River and improves connections to existing and future shared paths, including the Great River Walk.