Stage 1 works involved the fabrication of a 34-inch barrel for a Subsea Pig Receiver from supplied materials, with the complete structure weighing 104 tonnes. Stage 2 works included the fabrication of a 6-inch kicker header, testing of the SSPLR and retro-fitting.
GE Subsea Pig Launcher/Receiver
Energy
- 05.2015 - 10.2015
- GE Oil & Gas (for Chevron)
- Henderson, WA