The scope of work included the design verification and validation of existing design, procurement, logistics, supply, manufacture/fabrication, construction, erection and no-load commissioning of the earthworks, civil, structural, mechanical, process, electrical, control and communications of the facilities, to enable the handover of a fully functional expansion of the existing Jimblebar mine. The works interfaced with the existing OLC and primary crushing facility.
Jimblebar Expansion Project
Resources
- 09.2015 - 09.2016
- BHP Billiton
- Henderson and Pilbara, WA