Cryogenic insulation rectification works on equipment and piping included dismantling of existing cladding and cryogenic insulation; re-lagging (installation); re-cladding (installation); pre-fabrication of sheet metal in own site workshop; and pre-fabrication of PIR elbows for cryogenic insulation.
The complex and time-sensitive nature of the contract required Civmec to mobilise a workforce consisting of more than 200 employees and a complete site management team within a short timeframe.