Our scope on the project includes the supply, manufacture and testing of 30 subsea structures, including 13 mudmats, 7 inline tee (ILT) structures, 6 flow line end termination (FLET) structures, a riser base manifold (RBM), a RBM foundation, 32-inch pig launcher receiver (PLR) and 16-inch PLR.
The combined weight of the structures is 2,000 tonnes, and they will be shipped in five separate loadouts. Having commenced the project in 2022, we had completed 27 of the structures as of 30 June 2024, some of which are now in their final position in approximately 1,000-metre water depth below sea level.