Gold Roads Resources Limited and Gold Fields Limited
Goldfields, WA
Gruyere Gold Project
In a joint venture with Wood Group, the EPC contract included the detailed design, procurement and installation of the process plant and other non-process infrastructure, including administration office, workshop and warehouse.
Works also included installation of the main water pipeline and borefield powerlines.
Engineering, procurement, fabrication and modularisation, delivery, construction, integration, commissioning and performance testing was all self performed.